Sr.no | Client | Location | Project Co-ordinator | |
Projects/Po | ||||
1 | SUNSTREAM | Kamegaon | Sachin Shingne | 11 kv Transmission line & Bay work |
2 | JUNIPER | Bhigwan | 33kv Bay work-2nos | |
3 | ESSENS | Umari | Supply work order | |
4 | 33kv Transmission Line service | |||
5 | MEIL | Pen Raigad | Mahesh Tarmale | MH-WS_Raw Water Tunnel by CIDCO for enchancing the load at shaft-1 & shaft-2 location as per MSEDCL |
6 | MEIL | Kolhapur | Ratnagiri Kolhapur Pkg-3 Erection of 33 KV & 11KV HT lines, LT lines and DTCs at various locations of Utility works from CH- 112 to CH- 127 and CH-126+850 to 130+300 at NH 166 | |
7 | MEIL | Ratnagiri Kolhapur Pkg-3 Erection of 33 KV & 11KV HT lines, LT lines and DTCs at various locations of Utility works from CH- 130 to 136 | ||
8 | MEIL | Ratnagiri Kolhapur Pkg-3 Supply of 33KV,11KV and LT Line Fabrication Materials for Execution of Utility shifting works at Ch.126+300 KM to Ch 136+00 KM as per MSEDCL | ||
9 | MEIL | Ratnagiri Kolhapur Pkg-3 Internal utility shifting works of LT & HT at kerli basecamp at NH 166 | ||
10 | MEIL | Ratnagiri Kolhapur Pkg-3 utility shifting of verious section as per MSEDCL approved spacification in NH 166 | ||
11 | MEIL | Thane Borvali | MH-Roads_Twin Tube Road Tunnel, Pkg-II Extra Work of Execution of 630KVA Transformer Shifting works at Portal area as per MSEDCL | |
12 | MEIL | Pune | PRR W-I PKG | |
13 | MEIL | PRR E-I PKG | ||
14 | MEIL | PRR E-III PKG | ||
15 | SSD- Padalsingi | Padalsingi | Electrical Utility Shifting work & HT connection work | |
16 | RIL MSKVY 19 | Beed | Rohit Ture & Ashish Wagh | Statutory Approval |
17 | RIL MSKVY 20 | Statutory Approval | ||
18 | RIL MSKVY 21 | Laman Tanda Bay Supply | ||
19 | RIL MSKVY 22 | Supply and Service of TL and Bay Extention Babhalgaon | ||
20 | RIL MSKVY 23 | Additional work of LT shifting & RailwayCrossing work at limbarui site | ||
21 | RIL MSKVY 24 | Limibarui Bay Supply | ||
22 | RIL MSKVY 25 | Limibarui Bay Service | ||
23 | RIL MSKVY 26 | Limibarui TL supply | ||
24 | RIL MSKVY 27 | Laman Tanda TL Supply | ||
25 | RIL MSKVY 28 | Laman Tanda TL Service | ||
26 | RIL MSKVY 29 | Statutory Approval | ||
27 | TPGEL | Bramhanwel | Sachin Shingne | Approval for Start up power Bramhanwel site Dhule |
28 | TPGEL | Girijashankarwadi(GSW) | Approval for Start up power Girijashankarwadi(GSW) site Satara | |
29 | TPGEL | Sadawaghpur | Approval for Start up power at Sadawaghpur site Satara | |
30 | TPREL | Dondaicha, | Sandeep Didore | Barbed Wire Fencing Work |
31 | TPREL | Nandgaon | 33kV Transmission Line | |
32 | TPREL | Chain Link Fencing work | ||
33 | TPREL | Achegaon | Ganesh Suryawanshi | Construction of Pile Foundation |
34 | TPREL | Achegaon, Solapur | Sachin Pathe | 33 kv Tower line Achegaon Service |
35 | TPREL | 33 kv Tower line Achegaon Supply | ||
36 | INSOLAR | Beed | Rohit Ture | Statutory Approval MSKVY SPV 22 Dawakhana & L.Sawargaon |
37 | MSIDC | Chh.Sambhajinagar | Shubham Patil | Chh.Sambhajinagar execution of shifting of LT,HT,OH line, Crossing and DTC for road |
38 | MSIDC | Nanded Hingoli | Ashish Wagh | Nanded-Hingoli execution of shifting of LT,HT,OH line, Crossing and DTC for road |
39 | M/S STELMEC PVT LTD | Karjat Dist. Ahmadnagar | SITC of Transmission line (220kv) | |
40 | SITC of Transmission line from Substation Multickt (400kv) | |||
41 | SAI POWER (PROJECT) | Samruddhi Mahamarg | SITC of Highway Transmission line (400kv) | |
42 | M/S RENEW POWER PVT LTD | Pathari, Dist. Parbhani | SITC of Transmission line (132kv) – 5.6 kms | |
43 | M/S. SOLENCO INFRA | Ghansawangi, Dist. | SITC of Transmission line (132kv) – 8 kms | |
44 | Jalna | SITC GSS / Substation Bay (132kv) x 1Nos | ||
45 | M/S. JUNIPER GREEN ENERGY PVT LTD. | Jalkot, Dist. Latur | SITC of DC Transmission line (132kv) – 5 kms | |
46 | M/S. PROZEAL INFRA | Pathari, Dist. Parbhani | SITC of SC Transmission line (132kv) – 5 kms | |
47 | M/S. O2 POWER | Motala, Bhuldhana (MSETCL Substation) | SITC GSS / Substation Bay (132kv) x 1Nos | |
48 | M/S. PROZEAL INFRA | Patur, Dist.Akola (MSETCL Substation) | SITC GSS / Substation Bay (33kv) x 2Nos | |
49 | MSETCL (PROJECT) | Borvihir, Dist. Jalgaon | SITC of Transmission line (132kv) LILO – 3.9kms | |
50 | MSETCL (PROJECT) | Jalna, Dist. Aurangabad | SITC GSS / Rajur Substation Bay (132kv) x 1Nos | |
51 | SITC GSS / Bhokardan Substation Bay (132kv) x1Nos | |||
52 | MSETCL (O&M) | Kurduwadi, Dist. Solapur | SITC GSS / Substation (33kv) x 4Nos | |
53 | MEGHRAJ (PROJECT) | Waluj, Dist. Aurangabad | SITC of Railway crossing (220kv) | |
54 | TATA POWER RENEWABLE ENERGY LIMITED | 150MW Achegaon Dist. Solapur, MH | Construction of Pile Foundation Work | |
55 | TATA POWER RENEWABLE ENERGY LIMITED | 4MW, Borgi Dist. Sangli, MH | Solar Plant work AC Work, DC Work, BOS Earthing Work and Module cleaning system. | |
56 | TATA POWER RENEWABLE ENERGY LIMITED | 150MW, Achegaon Dist. Solapur, MH | Solar Plant DC works & BOS supply. | |
57 | TATA POWER RENEWABLE ENERGY LIMITED | 150MW, Achegaon Dist. Solapur, MH | Solar Plant DC works & BOS supply. | |
58 | TATA POWER RENEWABLE ENERGY LIMITED | 100MW, Nandgaon Dist. Nashik, MH | Construction of Pile Foundation Work | |
59 | TATA POWER RENEWABLE ENERGY LIMITED | 150MW Achegaon Dist. Solapur, MH | Supply and Erection of Inverter Yard Fencing, Entry Gate and Main Gate | |
60 | TATA POWER RENEWABLE ENERGY LIMITED | 25MW, Sakri Dist. Dhule, MH | 33 Kv D/c Suspension TL and Bay work (Supply and installation) and all Statutory Approvals | |
61 | MSKVY NINETHEENTH SOLAR SPV LTD | 79 MW, Dist. Beed, MH | All Statutory Approvals for Solar Plants under MSKVY 2.0 | |
62 | MSKVY TWENTY SECOND SOLAR SPV LIMITED | 49MW, Dist. Beed, MH | All Statutory Approvals for Solar Plants under MSKVY 2.0 | |
63 | TATA POWER RENEWABLE ENERGY LIMITED | Bramhanwel Dist. Dhule, MH Grijashankarwadi Dist. Satara, MH Sadawaghapur Dist. Satara, MH Khandke Dist. Ahmednagar, MH | Start up power Approvals for Existing Wind Mills | |
64 | GODREJ AND BOYCE | 25MW, Sakri Dist. Dhule, MH | All Statutory Approvals for Solar Plant for Mahagenco MSEDCL PPA Project | |
65 | MSKVY NINETHEENTH SOLAR SPV LTD | 5 MW, Dist. Beed, MH | All Statutory Approval for 5MW Kamkheda Solar Plant under MSKVY 2.0 | |
66 | INSOLARE ENERGY LIMITED | 13 MW, Dist. Beed, MH | All Statutory Approvals for Solar Plants under MSKVY 2.0 | |
67 | GODREJ AND BOYCE | 25MW, Sakri Dist. Dhule, MH | SITC of AMR meter for Mahagenco MSEDCL PPA Project | |
68 | BONDADA ENGINEERING LIMITED. | 90MW, Yavatmal, Dist. Washim MH | SITC of Transmission line (33kv) – 52 kms | |
69 | SITC GSS / Substation Bay (33kv) x 4Nos | |||
70 | JAI SAI CONSTRUCTION | Tal. Basmath Dist. Hingoli, MH | PWD Electrical Utility Shifting, SH-249 to Yerendreshwar Ridhora Palshi Lingi Pimplachore Babhulgaon Asegaon joining to SH-256 road km. | |
71 | LANDLOCK ENERGY INFRA ( SUNSTREAM GREEN ENERGY ) | 10MW, Kamegaon Dist. Dharashiv, MH | SITC of Transmission line Double circuit (11kv) – 7kms | |
72 | SITC GSS / Substation Bay (11kv) x 2Nos | |||
73 | 10MW, Mangewadi, Dist. Solapur, MH | SITC of Transmission line Double circuit (11kv) – 7kms | ||
74 | SITC GSS / Substation Bay (11kv) x 2Nos | |||
75 | MAHARASHTRA STATE INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED | Nanded – Hingoli, MH | Shifting of LT, HT , O/H Line, Crossing and DTC ( Simar Pride- Dipak Enterprises JV LLP) | |
76 | MAHARASHTRA STATE INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED | Ch. Sambhajinagar, MH | Shifting of LT, HT , O/H Line, Crossing and DTC (Pride Ventures-Urja Infra JV LLP) | |
77 | MEGHA ENGINEERING AND INFRASTRUCTURES LTD | Pune | Pune outer Ring Road PKG- W-I E-I & E-III | |
78 | VUB – GOVARDHANI JV (GANGAPUR WORK) | Gangapur, Dist. Chh.Sambhajinagar, MH | Turnkey Work of Switch Yard, HT/LT Line and Electrical Works (GMIDC) | |
79 | MEGHA ENGINEERING AND INFRASTRUCTURES LTD | Thane, MH | Thane-Borivali Tunnel MMRDA | |
80 | TATA POWER RENEWABLE ENERGY LIMITED | Achegaon Dist. Solapur, MH | Construction of Pile Foundation Work |